首页 体育内容详情
足球免费贴士(www.hgbbs.vip)_Kelana Jaya LRT line to increase train frequency by August, says transport minister

足球免费贴士(www.hgbbs.vip)_Kelana Jaya LRT line to increase train frequency by August, says transport minister

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

足球免费贴士www.hgbbs.vip)是国内最权威的足球赛事报道、预测平台。免费提供赛事直播,免费足球贴士,免费足球推介,免费专家贴士,免费足球推荐,最专业的足球心水网。

,Transport Minister Dr Wee Ka Siong says all repairs on carriages servicing the Kelana Jaya LRT line will be completed in November. – The Malaysian Insight file pic, June 16, 2022.

TRAIN frequency for the Kelana Jaya LRT line is expected to improve by August, Transport Minister Dr Wee Ka Siong said. 

He said it would be improved from eight minutes to at least five minutes after more damaged carriages are repaired.

“We have identified the cause for the damage and now repairs need to be done. So this August would be the interim progress, the frequency would be at five minutes,  and in November we will be able to complete all repairs,” he told a media conference today. 

Earlier, Wee had accompanied Prime Minister  Ismail Sabri Yaakob for a ride on the Putrajaya Phase 1 Mass Rapid Transit (MRT) line from the Kampung Batu station to Sri Damansara Sentral.

Wee said the Transport Ministry (MOT) had set the August and November target because a lot of preventive maintenance had to be carried out due to safety factors.

MOT apologises to all affected LRT users for the inconvenience, Wee said, adding that the delays were unavoidable in the interest of safety. 

“If we were to keep using (problematic trains) and there are risks… we would not want any untoward incidences,” he said. 

On May 22, Prasarana Malaysia Bhd said it had set up a committee after one of its trains on the Kelana Jaya Line stalled two days earlier due to a brake caliper hydraulic leakage, affecting about 22,100 passengers. – Bernama, June 16, 2022.


转载说明:本文转载自Sunbet。
 当前暂无评论,快来抢沙发吧~

发布评论